Floating Staircase Builders

Kent · South East

Floating Staircase Builders in Deal

Floating stairs in Deal are surveyed, engineered and installed by insured local specialists.

Request a free floating stair quote in Deal today.

Free Floating Staircase Builders quote in Deal

No obligation. We only use your details to reply about this job.

Deal and the surrounding area

Deal is in the Kent council area in the South East. Postcodes we cover here include CT14. We also take jobs in Eastry and Sholden.

Working in Deal

The South East has a large share of 1930s semi-detached housing and post-war estates, with plenty of new-build development around its larger towns. Victorian and Edwardian homes in Deal often have lath-and-plaster stair walls that must be rebuilt before a floating stair can be fixed. Coastal homes near Deal benefit from powder-coated steel and stainless fixings that resist salty air.

Detached houses in Deal often have a straight hallway stair ideal for a concealed-stringer floating stair. Many suburban homes around Deal replace an enclosed 1930s or 1970s stair with a floating design during an extension.

Guide prices for Deal

  • Old staircase removal and preparation: £600–£2,000. Stripping out the existing stair and preparing walls, joists and floor for the new structure.
  • Design, calculations and Building Control: £900–£2,500. Survey, drawings, structural calculations and application fees, usually built into the overall quote.
  • Frameless glass balustrade: £1,800–£4,500. Toughened glass panels in a base channel or clamps along the open side and landing.

Prices are a guide. Your quote for Deal is a fixed price based on the details you give us. Full price guide.

Floating Staircase Builders questions from Deal

Do I need Building Control for a floating staircase in Deal?

Usually, yes. A new staircase must comply with Part K and structural changes need approval. In Deal, your installer can submit plans to Kent Building Control or a registered building control approver on your behalf.

Can a floating stair go in a Deal terrace?

Yes, with careful design. Narrow Deal terraces need compact layouts and headroom checks. If fixings go into a party wall, a Party Wall Act notice may be needed.

Can you replace my old staircase in Deal?

Yes. The specialist removes your existing stair, prepares walls and joists, then installs the floating stair. In Deal homes this usually means a few days without stairs, so plan accordingly.

How long does a floating staircase take in Deal?

Allow two to three months from survey to completion in Deal. Design and approval take two to six weeks, fabrication four to eight weeks, and installation two to five days on site.

What goes on the open side of a floating staircase?

Most floating stairs use a frameless toughened glass balustrade on the open side, fixed into a base channel or with discreet clamps. Steel spindles, tensioned wires or timber slats are alternatives. The guarding must be at least 900 mm high on a private stair and have no gaps a 100 mm sphere could pass through.

Can a floating staircase have a landing or turn?

Yes. Floating stairs can include quarter landings, half landings and winders. Each turn adds complexity to the steelwork, especially for spine designs, and winder treads must still meet Part K minimum goings. Landings are often built as a steel frame clad in the same timber as the treads.

Get a free floating staircase builders quote in Deal

Tell us what you need and we'll come back with a clear price.

Request a quote