Portsmouth · South East
Floating Staircase Builders in Portsmouth
Planning a statement staircase in Portsmouth? Our vetted specialists work with Building Control across Portsmouth.
Where we work around Portsmouth
Portsmouth is in the Portsmouth council area in the South East. That includes the PO6, PO4, PO1, PO2, PO5 and PO3 postcode districts. The same team covers Gosport and Purbrook too.
Floating Staircase Builders in Portsmouth: local know-how
In Portsmouth townhouses, long steel stringers may need to come in through a front window or be spliced on site because of tight hallways. Party walls in Portsmouth terraces may require notice under the Party Wall Act if fixings go deep into a shared wall.
The South East has a large share of 1930s semi-detached housing and post-war estates, with plenty of new-build development around its larger towns. Post-2000 homes around Portsmouth with open hallways are well suited to central spine floating stairs. Glass balustrades in seaside properties around Portsmouth need regular cleaning to stay clear of salt film.
What we can do in Portsmouth
Central Spine Staircases
A single steel spine beam runs under the centre of the treads, giving a sculptural look that can stand away from walls.
Cantilevered Treads Into Masonry
Individual treads or steel tread bars anchored directly into a solid masonry wall, giving the purest floating look.
Glass Balustrades and Handrails
Frameless toughened glass balustrades, steel posts or minimal handrails fitted to meet guarding requirements on open-sided stairs.
Stair Design and Building Control
Survey, drawings, structural calculations and liaison with Building Control so the floating stair is safe and fully compliant.
Staircase Replacement and Removal
Removing an old enclosed staircase, making good the opening and preparing walls and floors for a new floating stair.
Concealed Stringer Floating Stairs
Treads welded or bolted to a hidden steel stringer fixed to the wall, then plastered over so the treads appear to float.
Typical costs in Portsmouth
- Central spine staircase: £9,000–£18,000. Powder-coated steel spine with timber treads, including engineering and installation.
- Straight concealed-stringer stair, oak treads: £6,500–£12,000. Typical 13-tread domestic stair, steel stringer, solid oak treads and plastering of the wall.
- Old staircase removal and preparation: £600–£2,000. Stripping out the existing stair and preparing walls, joists and floor for the new structure.
Prices are a guide. Your quote for Portsmouth is a fixed price based on the details you give us. Full price guide.
Floating Staircase Builders questions from Portsmouth
How long does a floating staircase take in Portsmouth?
Allow two to three months from survey to completion in Portsmouth. Design and approval take two to six weeks, fabrication four to eight weeks, and installation two to five days on site.
How do I get a floating staircase quote in Portsmouth?
Fill in our quote form with your Portsmouth postcode, floor-to-floor height, current stair layout and photos. A local specialist will arrange a survey and give you a fixed written price.
Are glass balustrades included for Portsmouth floating stairs?
Glass balustrades are quoted alongside the stair for Portsmouth customers. They are measured after treads are fitted and toughened to order, taking one to two weeks before fitting.
Can my Portsmouth home take a cantilevered staircase?
It depends on the wall. True cantilevers need solid masonry, usually 215 mm or thicker. Many Portsmouth homes have stud walls, in which case a concealed steel stringer or spine stair is used. An engineer checks during design.
What is a floating staircase?
A floating staircase is a stair where the treads appear to hang in the air with no visible stringer or risers. The support is hidden, usually a steel stringer concealed in the wall, a central steel spine or treads anchored into solid masonry. They are popular for opening up hallways and letting light pass through.
How long does it take to install a floating staircase?
Installation on site usually takes two to five days, depending on the design. Before that, survey, design and Building Control approval take two to six weeks, and fabrication of steel, treads and glass takes four to eight weeks. Plan for around two to three months from first survey to finished stair.
Helpful guides
Floating Staircase Installation: What Happens, Step by Step
A floating staircase project runs through survey, design and structural calculations, Building Control approval, steel and tread…
Read the guide →Floating Staircase Building Regulations: UK Rules Explained
In England, private stairs must follow Approved Document K: a maximum rise of 220 mm, minimum going of 220 mm and maximum pitch of 42…
Read the guide →Get a free floating staircase builders quote in Portsmouth
Tell us what you need and we'll come back with a clear price.
Request a quote